The following video clip demonstrates editing and review of the setup shown in the previous topic. The following actions are performed:

The first waste pass (Ate lift 1) has four trucks assigned, this will be reduced to three.

The other Subsequences will be checked.

Some group selection of Subsequences is conducted and the results noted