<< Click to Display Table of Contents >> Out of Pit Dump Ramp |
|
Out of Pit Dump Ramp. This ramp is used to elevate material from natural ground level to the current dump lift for the Out of Pit Dump. The Horizontal Alignment runs along the centreline of a ramp located in the Out of Pit Dump Surface. The horizontal alignment extends along the natural ground beyond the base of dump surface to connect with the Main Haul Road North. The Vertical Alignment follows the alignment of the Ramp in the Out of Pit Dump Surface.
Continue with the file open for the previous exercise or load the fileTopic_12_S2LW_Ramp.3dd.3dd, on completion save the file: Topic12_a_Complete.3dd