Out of Pit Dump Ramp

<< Click to Display Table of Contents >>

Navigation:  Tutorials > Truck and Shovel Simulation Tutorials > Short Term Truck and Shovel Simulation  > Creating Roads for Truck & Shovel Simulation. >

Out of Pit Dump Ramp

Previous pageReturn to chapter overviewNext page

Out of Pit Dump Ramp. This ramp is used to elevate material from natural ground level to the current dump lift for the Out of Pit Dump. The Horizontal Alignment runs along the centreline of a ramp located in the Out of Pit Dump Surface. The horizontal alignment extends along the natural ground beyond the base of dump surface to connect with the Main Haul Road North. The Vertical Alignment follows the alignment of the Ramp in the Out of Pit Dump Surface.

Continue with the file open for the previous exercise or load the fileTopic_12_S2LW_Ramp.3dd.3dd, on completion save the file: Topic12_a_Complete.3dd