<< Click to Display Table of Contents >> Strip 2 Highwall Ramp |
|
Strip 2 Highwall Ramp. This is the ramp, in the Strip 2 highwall, which takes Strip 3 Chione waste from the current Excavation Lift down to the Main Haul Road on the pit floor. Its Horizontal Alignment is located along the centreline of the highwall ramp in the Strip 2 Pit Shell. The Vertical Alignment follows the elevation of the ramp in the Strip 2 Pit Shell Surface. Note that has Strip 2 is already excavated these features now appear in the terrain (i.e. this ramp exists on the terrain surface).
Continue with the file open for the previous exercise or load the fileTopic12_a_Complete.3dd, on completion save the file: Topic_12_S2HW_Ramp.3dd