Dozer Report
This dialog box shows the simulation report for all simulation steps associated with the current dozer mode simulation.
Close Button
The button closes this dialog box.
Save to File Button
Click this button to save dozer simulation report to a file.
Delete Button
This button deletes all selected records (strings of the table) from the dozer simulation report.
Print Button
Click this button to print dozer simulation report.
Table
The simulation report is presented in a table format. Each line in the table shows the simulation report for one step. The data reported in the columns of the table are explained below.
Mach. Number
This is the number of the machines used in simulation step.
Simulation Name
This shows the name of the simulation step.
Max. Dig Depth
This column shows the vertical distance between the operating level and the deepest part of the excavation.
Max. Dump Heigt
This is the vertical distance between the operating level and the highest dump point.
Fraction Rehandle
This is the relation in percents of the total volume to the rehandle volume.
Volume/Dig Hour
This is the total volume divided by the dig hours. It is reported in bank cubic metres or bank cubic yards per dig hour.
Volume/Elapsed Hour
This is the total volume divided by the elapsed hours. It is reported in bank cubic metres or bank cubic yards per elapsed hour. Elapsed hours are the dig hours divided by availability factor.
Dig Time Total
This is the total operating time in hours and minutes for the simulation.
Dig Time Forward
This is the total operating time in hours and minutes in forward direction.
Dig Time Reverse
This is the total operating time in hours and minutes in reverse direction.
Average Speed Forward
This is the average speed in km/hours or mile/hour in forward direction.
Max Speed Forward
This is the maximum speed in km/hours or mile/hour in forward direction.
Average Speed Reverse
This is the average speed in km/hours or mile/hour in reverse direction.
Max Speed Reverse
This is the maximum speed in km/hours or mile/hour in reverse direction.
Average Load
If optimize blade load flag is set then this is the average blade load moved each cycle by 1st dozer in bank cubic metres or cubic yards, else average load = 0.0.
Std. Dv.
If optimize blade load flag is set then this is the standart deviation of blade load in cubic metres or cubic yards, else standart deviation = 0.0.
|