This dialog box shows the simulation report for all simulation steps associated with the current linked mode simulation.

Close Button

The button closes this dialog box.

Save to File Button

Click this this button to save simulation report to a file.

Delete Button

This button deletes all selected records (strings of the table) from the linked simulation report.

Print Button

Click this button to print simulation report.

Table

The simulation report is presented in a table format. Each line in the table shows the simulation report for one step. The data reported in the columns of the table are explained below.

Machine Number

This is the number of the machine used in simulation step.

Machine Name

This shows the name of the machine used in simulation step.

Max. Dig Depth

This column shows the vertical distance between the reference level and the deepest part of the excavation.

Max. Dump Heigt

This is the vertical distance between the reference level and the highest dump point.

Fraction Rehandle

This is the relation in percents of the total volume to the rehandle volume.

Volume/Dig Hour

This is the total volume divided by the dig hours. It is reported in bank cubic metres or bank cubic yards per dig hour.

Volume/Elapsed Hour

This is the total volume divided by the elapsed hours. It is reported in bank cubic metres or bank cubic yards per elapsed hour. Elapsed hours are the dig hours divided by availability factor.

Dig Time

This is the total operating time in hours and minutes for the simulation.