<< Click to Display Table of Contents >> South Pit Main Haul Pit Floor |
|
South Pit Main Haul Pit Floor. This Main Haul Road is a short Road located at the level of the South Pit Floor. It extends between the toe of the Strip 2 Highwall Ramp and Strip 3 Low wall Dump Base Ramp. Its Horizontal Alignment is a short straight section connecting the two ramp toes. Its vertical alignment is set to the level of the Pit Floor Surface (Chione Floor).
Continue with the file open for the previous exercise or load the file Topic 12_s3LW_Ramp.3dd, on completion save the file: Topic12_Complete.3dd
Save the 3d-DigPlus file as:
Topic12_Complete.3dd